1995 AJHSME Problems/Problem 16

Revision as of 09:15, 19 August 2019 by X ray (talk | contribs) (Problem)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Problem

Students from three middle schools worked on a summer project.

  • Seven students from Allen school worked for $3$ days.
  • Four students from Balboa school worked for $5$ days.
  • Five students from Carver school worked for $9$ days.

The total amount paid for the students' work was 744. Assuming each student received the same amount for a day's work, how much did the students from Balboa school earn altogether?

$\text{(A)}\ 9.00\text{ dollars} \qquad \text{(B)}\ 48.38\text{ dollars} \qquad \text{(C)}\ 180.00\text{ dollars} \qquad \text{(D)}\ 193.50\text{ dollars} \qquad \text{(E)}\ 258.00\text{ dollars}$

Solution

Altogether, the summer project totaled $(7)(3)+(4)(5)+(5)(9)=21+20+45=86$ days of work for a single student. This equals $744/86=9$ dollars per day per student. The students from Balboa school earned $9(4)(5)=\boxed{\text{(C)}\ 180.00\ \text{dollars}}$.

See Also

1995 AJHSME (ProblemsAnswer KeyResources)
Preceded by
Problem 15
Followed by
Problem 17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
All AJHSME/AMC 8 Problems and Solutions