1994 AJHSME Problems/Problem 17
Revision as of 13:44, 15 August 2011 by Mrdavid445 (talk | contribs) (Created page with "==Problem== Pauline Bunyan can shovel snow at the rate of <math>20</math> cubic yards for the first hour, <math>19</math> cubic yards for the second, <math>18</math> for the thi...")
Problem
Pauline Bunyan can shovel snow at the rate of cubic yards for the first hour, cubic yards for the second, for the third, etc., always shoveling one cubic yard less per hour than the previous hour. If her driveway is yards wide, yards long, and covered with snow yards deep, then the number of hours it will take her to shovel it clean is closest to