Problem

Marie does three equally time-consuming tasks in a row without taking breaks. She begins the first task at $1\!:\!00$ PM and finishes the second task at $2\!:\!40$ PM. When does she finish the third task?

$\textbf{(A) }\text{3:10 PM}\qquad\textbf{(B) }\text{3:30 PM}\qquad\textbf{(C) }\text{4:00 PM}\qquad\textbf{(D) }\text{4:10 PM}\qquad\textbf{(E) }\text{4:30 PM}$

Solution

Marie finishes $2$ tasks in $1$ hour and $40$ minutes. Therefore, one task should take $50$ minutes to finish. $50$ minutes after $2\!:\!40$ PM is $3\!:\!30$ PM, so our answer is $\boxed{\textbf{(B) }\text{3:30 PM}}$

Video Solution

https://youtu.be/Wc8feyJcn70

~Education, the Study of Everything

Video Solution

https://youtu.be/7CcxOXjv3i8

~savannahsolver

See Also

2015 AMC 10B (ProblemsAnswer KeyResources)
Preceded by
Problem 1
Followed by
Problem 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
All AMC 10 Problems and Solutions

The problems on this page are copyrighted by the Mathematical Association of America's American Mathematics Competitions. AMC logo.png