Difference between revisions of "2008 AMC 10B Problems/Problem 18"
Megaboy6679 (talk | contribs) (→Solution) |
m (→Solution) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 7: | Line 7: | ||
Let <math>x</math> be the number of bricks in the chimney. The work done is the rate multiplied by the time. | Let <math>x</math> be the number of bricks in the chimney. The work done is the rate multiplied by the time. | ||
− | Using <math>w = rt</math>, we get <math>x = \left(\frac{x}{9} + \frac{x}{10} - 10\right)\cdot(5)</math>. Solving for <math>x</math>, we get <math>\boxed{ | + | Using <math>w = rt</math>, we get <math>x = \left(\frac{x}{9} + \frac{x}{10} - 10\right)\cdot(5)</math>. Solving for <math>x</math>, we get <math>900</math>, or <math>\boxed{B}</math>. |
==See also== | ==See also== | ||
{{AMC10 box|year=2008|ab=B|num-b=17|num-a=19}} | {{AMC10 box|year=2008|ab=B|num-b=17|num-a=19}} | ||
{{MAA Notice}} | {{MAA Notice}} |
Latest revision as of 18:39, 3 November 2024
Problem
Bricklayer Brenda takes hours to build a chimney alone, and bricklayer Brandon takes hours to build it alone. When they work together, they talk a lot, and their combined output decreases by bricks per hour. Working together, they build the chimney in hours. How many bricks are in the chimney?
Solution
Let be the number of bricks in the chimney. The work done is the rate multiplied by the time.
Using , we get . Solving for , we get , or .
See also
2008 AMC 10B (Problems • Answer Key • Resources) | ||
Preceded by Problem 17 |
Followed by Problem 19 | |
1 • 2 • 3 • 4 • 5 • 6 • 7 • 8 • 9 • 10 • 11 • 12 • 13 • 14 • 15 • 16 • 17 • 18 • 19 • 20 • 21 • 22 • 23 • 24 • 25 | ||
All AMC 10 Problems and Solutions |
The problems on this page are copyrighted by the Mathematical Association of America's American Mathematics Competitions.